
Residential roofing
Roof replacement in Dripping Springs, Austin and the Hill Country
A full roof replacement means tearing off the old covering down to the decking, repairing what is rotten, installing new underlayment, flashing, ventilation and shingles or panels, and hauling everything away. Most Central Texas homes take one to three days once materials are on site. We climb every roof before we quote one — no satellite-only estimates — and we take no deposit, so you pay when the job is finished.
Price my roof
A real person answers. Every call.
The short answer
The short version: a replacement is right when the covering has failed across the whole roof rather than in one spot. Widespread granule loss, brittle or cupping shingles, leaks appearing in different places, or hail bruising over several slopes all point that way. One flashing detail letting water in does not, and we will say so.
How do I know whether I need a new roof or a repair?
By where the problem is, not how old the roof is. One bad valley and a split pipe boot with thirty good squares around them is a repair. A roof where the mat is brittle, the granules are gone off the south and west slopes, and water has found three ways in over two years is a replacement — patching that buys months. We show you both options with photographs and the cost of each. See roof repair.
How much does a new roof cost in the Austin area?
Published 2026 ranges for this market put a typical architectural-shingle replacement between $9,000 and $18,000, and standing-seam metal between $16,000 and $30,000 — but the number depends on square footage, pitch, penetrations, layers, the decking we find once it is open, and the material, because the same house in asphalt, metal and tile is three different quotes. We still have not published a band of our own and we are not going to invent one. What we do instead is climb the roof, measure it, photograph it, and hand you a written scope with the line items priced, including the per-sheet decking rate, before you commit to anything.
What should it cost? See the sourced per-square and total ranges for Austin, what moves the number, and a financing calculator — every figure carries the URL and the date we read it.
How long does a roof replacement take?
One to three days of work on a typical Central Texas house, once materials are on site. A steep or cut-up roof, a tile or metal system, or bad decking all add time. Weather adds more: we do not tear off a roof we cannot dry in the same day. If the date moves you hear it from us first.
What material should I put back on?
Most houses here go back on architectural asphalt shingle, and we install Class 4 impact-rated shingles — worth asking your insurance agent about before you choose. Standing-seam metal costs more up front and lasts far longer, which makes it a question about how long you intend to own the house. Tile is its own trade. We carry Owens Corning, CertainTeed and Malarkey products. See asphalt shingle, metal and tile roofing.
Will my insurance pay for a new roof after hail in Texas?
Sometimes. It depends on the damage and your policy, not on how much you want a new roof. Document the roof first, then decide whether to file at all — a claim on a roof that will not total can be worse than no claim. You file your own claim; we inspect and document; we meet your adjuster on site if you invite us; we build to the approved scope and supplement with evidence when the scope is short; we do not promise an outcome, and Texas law forbids waiving your deductible. The detail is in our Texas roof insurance claims guide, and storm and hail damage covers what to do first.
Do I have to pay a deposit?
No. Nothing changes hands before the work starts, on a repair or a full replacement. You pay when the job is finished and you have walked the property with us. On an insurance job, Texas law (HB 2102) also forbids any roofer from waiving, absorbing or rebating your deductible — a Class B misdemeanor — so treat an offer to do it as information about the company making it.
How long will my new roof last?
An architectural asphalt roof installed correctly here is usually a twenty-plus-year roof, and the two things that shorten it are ventilation and hail. Standing-seam metal goes much longer. Manufacturer warranties cover the product and we register them for you; our five-year workmanship guarantee covers the installation, which is the part that fails early.
What happens to my landscaping, my driveway and my gutters?
We tarp beds and shrubs under the work zone, keep the dumpster off the driveway where we can, and sweep with a rolling magnet every day rather than once at the end. Gutters take a beating during a tear-off; if yours are loose or dented already, you hear it before we start. See gutters and siding.
The system
The Ridgeline System™
There are four parts to a Ridgeline System™ roof, and every one of them is on the written scope you get before anybody starts.
Class 4 Shield
Impact-rated shingles where the roof and the budget suit them. Class 4 is the top UL 2218 impact class, and most Texas carriers discount a premium for it — ask yours before you decide, because the discount is theirs to set, not ours to promise.
DryDeck Barrier
Synthetic underlayment across the whole deck, and ice-and-water membrane in the valleys and at the eaves — the two places water actually gets in. Decking that has gone soft is replaced and photographed before anything covers it.
TightSeal Flashing
New step and counter flashing, new pipe boots and new drip edge on every job. Re-using old flashing is the single most common reason a new roof leaks in its first year, and it is where the money gets quietly saved on a cheap bid.
BreatheRight Ventilation
Balanced intake and exhaust, sized to the attic rather than to whatever was up there before. Get this wrong and the shingles cook from underneath, which is how a 30-year roof becomes a 15-year roof in this climate.
Our guarantee
The On Course Guarantee™
- Five-year Waypoint workmanship guarantee on installs
- A written photo report on every inspection, whether or not you hire us
- If something is not right, we come back until it is
How a replacement runs, in three steps
- Step 1
We inspect and document
The roof is measured and photographed from the roof, and the decking, flashings and penetrations are looked at before anything is priced, so the quote is written from the actual roof.
- Step 2
You decide
You get the options side by side — system, colour, ventilation, what it costs — and a written scope you can hand to another roofer to compare. Nobody sits in your kitchen waiting for a signature.
- Step 3
We build it
Tear-off, decking repairs where they are needed, dry-in and install to the specification you picked, photographed as it goes, site cleaned and magnet-rolled. No deposit; you pay when it is done.
What you can hold us to
No deposit — you pay when the job is done
You settle up after the roof is on, the site is clean and you have walked it with us.
We climb every roof
The scope is written from the roof itself, not from a satellite measurement, so what is quoted is what is up there.
HAAG-certified inspectors
The person who inspects the roof writes the scope, and they are trained to the damage-assessment standard the insurance industry uses.
Phones answered 24/7
A roof being planned still generates questions at odd hours. The number on this page is the one that reaches us.
What is actually in the price, and what is not?
Roofing quotes are hard to compare because the cheap one is usually cheap somewhere specific. Here is our standard scope, split into what is in the base price and what is priced on its own. If a competing quote is much cheaper, ask them which of these lines they included.
| Line item | In the base price? | Why it is on this list | Published price |
|---|---|---|---|
| Permit and HOA submission | Included | Both want paper before the dumpster arrives. | Not published yet |
| Full tear-off to the deck | Included | You cannot see decking through shingles. | Not published yet |
| Deck inspection and sheathing replacement | Included up to the allowance in your proposal | Bad sheathing only shows up after tear-off, so the per-sheet price is in the proposal. | Not published yet |
| Synthetic underlayment | Included | The barrier that works between tear-off and dry-in. | Not published yet |
| Ice-and-water at valleys and penetrations | Included | Where Central Texas roofs actually leak. | Not published yet |
| New drip edge, flashing and pipe boots | Included | New, not reused. A reused boot is a leak with a date on it. | Not published yet |
| Ridge ventilation to code | Included | Sized to the attic, not to whatever was there before. | Not published yet |
| Magnet sweep, haul-off and warranty registration | Included | Nails in a driveway are our problem, not yours. | Not published yet |
| Decking beyond the allowance | Priced separately | Nobody knows how many bad sheets there are until it is off. | Not published yet |
| Structural repair — rafters, trusses, framing | Priced separately | Carpentry under the roof, not roofing. Rare. | Not published yet |
| Gutter replacement | Priced separately | Old gutters often survive a tear-off. When they will not, we say so. | Not published yet |
| Solar detach and reset | Priced separately | Usually done by the solar installer. | Not published yet |
| Skylight replacement | Priced separately | An old skylight under a new roof is the next leak. | Not published yet |
- Scope reflects Waypoint’s standard residential replacement specification. Prices are quoted per job after a measured, photographed inspection; no cost band is published on this site because none has been sourced from our own completed-job records yet.
What we carry
Texas does not license roofers. Here is what we carry:
RCAT member · Owens Corning · CertainTeed · Malarkey · Versico · HAAG-certified inspectors · Insured: $1M per occurrence / $2M aggregate general liability · Dripping Springs Chamber · Lake Travis Chamber · No deposit, pay on completion
Best of Dripping Springs 2025 (Dripping Springs Express News)
Texas does not license roofing contractors. The checkable version instead: general liability $1M per occurrence / $2M aggregate, current, certificate on request. Founded in Dripping Springs in 2024; our team brings more than 40 years of combined roofing experience. HAAG-certified inspectors. Five-year workmanship guarantee on installs.
Recent work
Jobs we photographed ourselves

Rotted decking found during a Cedar Park tear-off

Tear-off and new decking on an Austin re-roof

New step flashing and drip edge on a Dripping Springs roof
Common questions
Can I stay in the house while the roof is replaced?
Yes, and most people do. A tear-off is loud from about seven in the morning until the crew stops, and the vibration knocks things off a wall that was not fastened well. Take pictures down in the rooms under the work, park outside the drop zone, keep pets somewhere quiet. If somebody works nights, tell us and we will plan the slopes around it.
Who pulls the permit?
We do, and it is in the base price. Requirements differ between the county and the incorporated cities we work in, and an HOA usually wants a color and material submission on top. We handle both. If your HOA review window runs longer than the build itself, you hear that before you sign, not after the materials land.
Will a new roof lower my insurance premium?
It can, and Class 4 impact-rated shingles are the reason. Texas carriers commonly discount an impact-rated roof, but the size of it and whether you qualify are your carrier’s call. We install Class 4 shingles and give you the product documentation your agent will ask for. Ask what the discount is before you choose the shingle, not after.
Free, no obligation
Request a free inspection
Two questions, and we call you back to schedule.
Price my roofOr call (512) 305-1111
Last updated